A brief introduction about the block production Line

Time: October 14th,2022  |  Source: HF Machinery

A loader pours some raw materials (rubble, stone, sand, limestone, metal tailing, fly ash or solid construction waste) into the aggregate hopper. 

There’s an aggregate weighing batcher (under the hopper) weighing the materials accurately and automatically. 

Sensors are equipped with the weighing batcher.


The skip hoister takes the materials to the mixer.

In the meantime, put cement into the mixer.

The mixer mixes the cement and aggregate (wet concrete) automatically.

All the ratio of water and cement is controlled by the computer precisely and automatically (software Siemens PLC).

After mixing, the wet concrete is shipped to the storage hopper of the block making machine by the wet concrete conveying belt.

First, Wet concrete goes to the filler box.

Second, The up mould comes down to compress the wet concrete in the mould. The vibration table is vibrating.

After the vibration, the up mould comes up (demoulding).

Then the fresh blocks are well formed on the pallets.

There are selfcentering and positioning devices to ensure the pallets won’t be moved or swayed.

Pls note that the pallets are moved forward automatically on the vibration table as sensors and positioning devices can control all the movement .

Wet blocks (on the pallets) are conveyed by the green block conveyor.

Then a mobile stacking device stacks the pallets with wet blocks layer by layer. A forklift comes to pick up all the blocks for curing.

The normal curing condition is that the temperature is from 34 to 37 degree Celsius and the relative humidity reaches 91%.

The curing time in the curing kiln or shed is for 8-12 hours.

After the first curing,the cured blocks are stacked manually to sent to the outside for second natural curing.

The second natural outside curing period is for 28 days. In such a condition, the blocks meet the ideal requirement for ideal density and strength.

However, the second natural outside curing time can be shorter due to hot weather.

For example, Our Indian customers cure the blocks outside for only 7-8 days.

The formula, ratio and the weight are all controlled by the computer (Intelligent management and control system).

The density of the blocks can be changed according to different ingredients and raw materials.

You can check and adjust the data through computer.

Qingdao HF machinery Co.,Ltd have a professional senior engineer team here to provide solutions for you.

If you have any questions, you are always welcome to contact us.

Thank you.

Back To The List  

Related News

What are the advantages of mold vibration block machine compared with table vibration block machine?

The Molding Vibration Block Machine has a short forming cycle and high production output. The continuous increase in vibration frequency during material feeding and forming vibrations reduces the feeding time by 3 to 4 seconds. The table vibration machine

What are the Problems with Brick Manufacturing?

Brick manufacturing has been an essential part of construction for centuries, providing durable and aesthetically pleasing building materials. However, the process of producing bricks is not without its challenges. As the world becomes more environmentall

What is the hollow block machines?

A hollow block machine is a piece of industrial equipment specifically designed to produce hollow blocks, which are a type of concrete masonry unit (CMU) used in construction. These machines come in various sizes and capacities, and their primary function

Sales Consultant

Whether for inquiries for inspections and
maintenance, for individual plant optimizations or
extensions, or spare and wear parts.

E-mail:sales@hfblockmachine.com

After Sales Support

Our after-sales service is at your disposal for all
questions

Tel:0086-532-58729401

HF Machinery

Gemini Tower, Block B, Chunyang Road, Chengyang District, Qingdao, China

Show on the Map

GET YOUR FREE QUOTE

We will contact you within 24 hours.

X